Order Report

Feasibility Report Package

Turn your candidate-site and project information into a downloadable feasibility package, with automated screening, planning calculations, and selected-site analysis.

DCFR Report Package

What’s Included

Up to 20 candidate sites per project

Screen up to 20 submitted parcels through one consistent planning-grade workflow before committing deeper diligence effort to a single site.

Candidate comparison + confirmation priorities

Compare submitted sites using estimated area demand, stated acreage, source availability and outstanding confirmations. The comparison supports your shortlist decision; it does not verify buildability.

Selected-site, 7-module DCFR feasibility studies

Use each detailed analysis run to advance a shortlisted parcel or scenario into the coordinated feasibility package covering site fit, utilities, code/fire exposure, cooling/water/noise, constructability, cost, schedule, and risk.

Site area budget + proportional planning diagram

Review transparent area allowances for the building, support yards, circulation, stormwater and expansion. The proportional diagram illustrates quantities; a surveyed parcel test-fit and architectural site plan require separate design work.

Downloadable 11×17 planning report

Receive seven planning modules, calculation tables, an area-budget diagram, an evidence register and a risk/action register. Page count follows the available evidence and findings.

Capacity + land-fit calculations

Scenario calculations translate target IT load into facility power, rack count, floor area and support-yard demand. Submitted acreage and explicit allowances establish an estimated area budget; parcel geometry is not verified.

Infrastructure, code, cooling, constructability, cost + schedule analysis

The coordinated modules organize power and utility exposure, zoning/building/fire-code prompts, cooling/water/noise strategy, materials and constructability direction, and planning-level cost/schedule/risk findings.

Risk register + confirmation-required action list

Clearly separate calculated planning outputs from utility, civil, environmental, geotechnical, code, fire, cost, schedule, permitting, and other items that require qualified external confirmation.

Downloadable PDF + consultant handoff package

Receive the final digital report package for internal review, acquisition discussion, consultant scoping, and next-step professional due diligence.

Report pricing

Choose the plan for your report workload.

All seven modules are included. Choose by project volume, analysis runs, and users.

Monthly billing · USD before applicable taxes · No automatic overage charges

Paid access opening soon. Request your preferred plan below. No payment is collected.

Scroll across to compare plans on smaller screens.

Monthly plansStarter$499per monthRecommendedProfessional$1,299per monthTeam$2,499per month
Active projects115
Candidate-site screens / month20120
Detailed analysis runs / month318
Users15
All seven feasibility modulesIncludedIncluded
PDF exports of completed resultsIncludedIncluded
Shared project workspaceSingle userIncluded
Order reportOrder StarterOrder Team

Allowances are shared across your account. Each project can hold up to 20 candidate sites. Archiving a project frees a slot but does not restore usage.

One detailed run = one site + one set of assumptions. Three runs can evaluate three sites or three scenarios on one site. Viewing saved results, editing notes, and downloading existing reports do not use another run.

No subscription required

Project Pass

$799one time

One project · 20 screens total · 3 detailed runs total · 1 user · 90 days of access. All seven modules and PDF exports included.

Order Project Pass

For active subscribers

Additional Analysis + Report

$300per additional run

One additional site analysis and generated PDF. Uses your existing project and candidate-screen allowances. No additional project slots or users.

Order Additional Analysis

Unused included screens and runs roll over for one additional billing month while subscribed. Cancel before your next renewal; access continues through the paid period, followed by 90 days of read-only access to saved results and downloads.

What you receive

A complete seven-module feasibility package.

Move from candidate comparison to a coordinated site analysis, with documented assumptions and next steps.

Scope

Up to 20 candidate-site screens

Compare submitted candidate sites using one consistent planning-grade screening framework before advancing one location.

Selected site

Seven modules per detailed run

Each detailed run evaluates one selected site and one set of assumptions, with a coordinated DCFR report and handoff package.

Report depth

Evidence-led page count

The current report includes all seven modules, an area-budget diagram, calculations, source evidence and a risk register. Length varies with content; no fixed page count is promised.

Delivery status

Track progress in your workspace

Requests run in the background. Your workspace shows queued, running, completed or failed status. Processing depends on candidate count, source availability and supplied inputs.

Planning-grade decision support — not final engineering or permit documentation.

Automated SaaS delivery

From project inputs to a downloadable report.

Complete the project questionnaire with the information you have. DCFR uses those inputs and supported public sources to calculate planning scenarios, record unresolved constraints and assemble the report package.

A standardized digital software output — not a consulting engagement.

Reports are software-generated. No human professional review or live consultation is included in the standard purchase. The output is planning-grade decision support and must be independently verified before acquisition, design, permitting, financing, or construction decisions.

Seven coordinated modules

What the full feasibility study actually produces

Each module contributes calculations, diagrams, findings, assumptions, and next-step actions to the selected-site report.

01

Candidate Site Screening

Screen up to 20 submitted sites and identify which candidates deserve deeper review before acquisition momentum builds.

Representative outputs

Candidate area comparison · estimated headroom / sensitivity / deficit · source coverage · missing-input flags · confirmation priorities

02

Zoning, Building & Fire Code Feasibility

Organize early zoning, building-code, fire/life-safety, access, separation, and authority questions before formal design and permitting.

Representative outputs

Zoning/use exposure · setback / site-control prompts · construction-type assumptions · fire apparatus access · generator/BESS/fuel separation prompts · AHJ / permit-path checklist

03

Power & Utility Feasibility

Evaluate the planning path from target load to utility exposure, electrical infrastructure, backup generation, and phasing risk.

Representative outputs

Load basis · utility-path exposure · electrical / transformer yard allowance · generator / fuel strategy · phasing sensitivity · utility confirmation register

04

Cooling, Water, Noise & Environmental Feasibility

Test how cooling strategy, heat rejection, water/sewer exposure, and sensitive-edge conditions can affect site viability.

Representative outputs

Cooling strategy comparison · cooling-yard allowance · water/sewer exposure · heat-rejection planning · sensitive-edge / acoustic prompts · confirmation actions

05

Parcel Capacity & Site-Fit Model

Estimate whether the submitted acreage can accommodate the program under documented planning assumptions, then identify the survey and engineering checks needed to establish physical fit.

Representative outputs

Proportional area-budget diagram · building-area range · support-yard allowance · circulation, stormwater and expansion allowances · physical-fit confirmation items

06

Structure, Envelope & Constructability

Translate feasibility findings into a practical early architectural, modularization, logistics, and constructability direction.

Representative outputs

Envelope / facade direction · modular / prefabrication opportunities · equipment replacement access · laydown / crane / truck logistics · material considerations · constructability findings

07

Cost, Schedule, Risk & Decision Record

Bring the selected-site findings together into a decision framework for the next stage of professional due diligence.

Representative outputs

Cost scenario when unit-cost assumptions are provided · schedule dependencies · open risks · decision gates · responsible-party action register

Basis of analysis

What DCFR is based on

DCFR combines submitted site inputs, visible site/context conditions, rule-based planning logic, and transparent assumptions to produce an early feasibility judgment.

01

User-provided inputs

Candidate addresses, parcel links, target program intent, and submitted site information.

02

Public-source evidence

Supported official data services are queried where location and coverage permit. Unavailable sources and unresolved local records remain explicitly flagged.

03

Planning-grade calculation logic

Area-budget scenarios, MW-to-area demand, support-yard allowances, circulation, stormwater and expansion calculations.

04

Rule-based data center assumptions

Early-stage allowances for data hall geometry, electrical and generator yards, cooling, fuel, fire access, and security.

05

Confirmation-required items

Utility, civil, code, environmental, legal, MEP, cost, schedule, and authority items that require qualified external confirmation.

Professional confirmation required

DCFR is planning-grade decision support. Final engineering, stamped drawings, utility capacity, zoning interpretation, environmental studies, civil design, geotechnical conditions, acoustics, cost, schedule, permit path, and authority approvals require confirmation by qualified external professionals and authorities.

Delivery FAQ

What to expect after purchase

How long does the DCFR Report Package take?

Start screening or a selected-site report from your project workspace. Processing runs in the background, with status and completed downloads available under Reports. Timing depends on the submitted sites and external source availability; a fixed delivery time is not guaranteed.

How long is the selected-site report?

The report includes seven planning modules, calculation and assumption records, an area-budget diagram, source evidence and open risks/actions. Page count varies with evidence and findings. The sample illustrates the format and does not establish a fixed deliverable length.

Is the DCFR Report reviewed by an architect or engineer?

No human professional review is included in the standard digital product. The report is generated through DCFR’s standardized software workflow using submitted project information, rule-based planning logic, calculations, and documented assumptions. DCFR reflects architect-led domain knowledge, but the generated report is not stamped, sealed, permit-ready, or a substitute for licensed architectural, engineering, legal, environmental, utility, or authority review.

How detailed is the report?

The report is planning-grade and intended to support early go / no-go decisions, site comparison, acquisition discussion, internal review, consultant scoping, and handoff. It is not final engineering, construction documentation, a utility commitment, entitlement approval, environmental clearance, or permit documentation.

Ready to get started

Order Your DCFR Report Package

Use the standardized DCFR workflow to screen up to 20 candidate sites, then generate a seven-module planning report for a selected site. Track processing in your workspace and download the report when ready. Source gaps and required external confirmations remain visible.